Full Depth Reclamation Emulsified Asphalt Stabilized Base Course

Shanghai Doan Machinery Technology Co.,Ltd is a road repair machine manufacturing factory ,which is specialized in manufacturing Asphalt Distributor,Crack Router,Crack Sealing Machine,Chip Spreader,road roller,Asphalt Mixing Plant ,etc.
we own dozens of advanced production lines and advanced production technology and high quality professional management talents to ensure excellent product quality.

Our products include:

Terms:

1) Delivery term: FOB,CNF CIF

2) Delivery lead time: 30 days after receive T/T deposit.

3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.

4) Quality assurance: Test Certificate is supplied with shipment, third Party Inspection is acceptable.

Our Advantage:

1.Operating radius is small, can work in a small area,suitable for groove backfill;
2.With HONDA gasoline engine or famous water-cooled diesel engine,superior performance,easy to operate;
3.With international famous brand PH hydrauulic drive unit,infinitely variable speed;
4.Hydraulic steering,reversing conveniently; Vibratory Road Roller
5.Internationally renowned NSK Bearings,MITSUBOSHI (Samsung) belt, to ensure the work performance of machine;

Inquiry Us Inquiry For More Information!Send Email To: [email protected]

  • Full Depth Reclamation – ‘rubblizing’ asphalt Asphalt ...

    In summary, full depth reclamation converts a worn-out asphalt pavement into a stabilized base course. FDR removes pavement crack patterns and eliminates reflective cracking. FDR conserves materials by re-using pavement components.

    Learn more

  • Best Practices for Full-Depth Reclamation Using …

    Asphalt emulsion full-depth reclamation (AEFDR) is a process that pulverizes an existing asphalt pavement, mineral aggregate base course, and, sometimes, the subgrade and mixes this resulting ground up granular material with a small quantity of emulsified asphalt.

    Learn more

  • SECTION 308 – ASPHALT EMULSION STABILIZED FULL …

    308-R-656 ASPHALT EMULSION STABILIZED FULL DEPTH RECLAMATION, FDR (Adopted 04-20-17) ... excluding subgrade, to construct a reclaimed base course, RBC, to the approved design properties in accordance with 105.03. 308.02 Just in Time Training, JITT ... The pre-determined full depth of asphalt pavement and base materials shall be pulverized ...

    Learn more

  • FULL DEPTH RECLAMATION USING ENGINEERED …

    into stabilized base for a new pavement surfacelayer. This guide is presented for aFDRn -E ... FULL DEPTH RECLAMATION USING ENGINEERED EMULSION August 2013. 1. 1 - 1. Full Depth Reclamation-Engineered emulsion (Full Depth Reclamation-Engineered Emulsion) Reclamation-Engineered emulsion ) AC

    Learn more

  • Chapter 17 - 98042 - Recycling - Sustainability ...

    In full depth reclamation technique, all of the asphalt pavement section and a predetermined amount of underlying materials are treated to produce a stabilized base course. The treatment additive can be emulsified asphalt binder, portland cement, lime, fly ash, and calcium chloride.

    Learn more

  • ACPLM - What is Full Depth Reclamation?

    Apr 16, 2013 · Full Depth Reclamation (FDR) is a pavement rehabilitation technique in which the full flexible pavement section and a predetermined portion of the underlying materials are uniformly crushed, pulverized or blended, resulting in a stabilized base course; further stabilization may be obtained through the use of available additives. (ARRA)

    User rating 5/5

    Learn more

  • Full-Depth Reclamation - Pavement Interactive

    Although referred to as “full-depth reclamation”, this process is just an extension of the basic CIR principles to the entire HMA pavement depth plus a predetermined depth of the base material. FDR can be used to depths of 300 mm (12 inches) or more but the most typical applications involve depths of between 150 and 225 mm (6 and 9 inches) (Better Roads, 2001 [1]).

    Learn more

  • Full-Depth Reclamation (FDR)

    A very popular reconstruction alternative is known as Full-Depth Reclamation (FDR). FDR is an in-place recycling method for reconstruction of existing flexible pavements using the existing pavement section material as the base for the new roadway-wearing surface.

    Learn more

  • ACPLM - What is Full Depth Reclamation?

    Full Depth Reclamation (FDR) is a pavement rehabilitation technique in which the full flexible pavement section and a predetermined portion of the underlying materials are uniformly crushed, pulverized or blended, resulting in a stabilized base course; further stabilization may be obtained through the use of available additives. (ARRA)

    Learn more

  • Full Depth Reclamation - iowasudas

    Full depth reclamation (FDR) is a pavement rehabilitation technique in which the full depth asphalt pavement section and a predetermined amount of the underlying materials are uniformly crushed, pulverized, or blended, resulting in a stabilized base course that may be further enhanced through the

    Learn more

  • SECTION 308 – ASPHALT EMULSION STABILIZED FULL …

    308-R-656 ASPHALT EMULSION STABILIZED FULL DEPTH RECLAMATION, FDR (Adopted 04-20-17) ... the penetration of the design emulsified asphalt. The asphalt emulsion shall be received on the job site at a ... The pre-determined full depth of asphalt pavement and base materials shall be pulverized, along with the corrective

    Learn more

  • Asphalt Emulsions Provide Cohesion, Improve Aged Binder

    For failed pavements, full-depth reclamation (FDR) reclaims and treats an entire road structure – including underlying materials – to produce a stabilized base course ready for overlay.

    Learn more

  • Design and Constructability of Emulsion-Stabilized …

    Nazarian et al. November 2012 1 1 DESIGN AND CONSTRUCTABILITY OF EMULSION-STABILIZED BASES FOR 2 FULL-DEPTH RECLAMATION 3 4 ABSTRACT 5 Full-depth reclamation (FDR) of base courses with chemical-based stabilizers has been a 6 common practice in many areas of Texas.

    Authors Soheil Nazarian · Deren YuanAffiliation University of Texas at El Paso

    Learn more

  • Full Depth Reclamation ( FDR) - cdn.ymaws

    A Full Depth Reclamation is a pavement rehabilitation technique in which the full ... Emulsified Asphalt ... More flexible than other base course materials and chemical stabilizers, offers superior fatigue resistance, and is not prone to cracking

    Learn more

  • Full-Depth Reclamation with Cement - nwpma-online

    Full-Depth Reclamation with Cement Northwest Pavement Management Association 2012 Conference – Vancouver, WA ... stabilized base course for a chip seal, asphalt, or concrete wearing surface. Types of Reclamation Methods Mechanical Stabilization Bituminous Stabilization – emulsified asphalt – expanded (foamed) asphalt

    Learn more

  • FULL DEPTH RECLAMATION USING FOAMED ASPHALT

    full depth reclamation using foamed asphalt june 2012 FDR-FA effectiveness is governed by the quality of the design, materials being reclaimed, underlying layer support, variability in materials and subgrade conditions along the project,

    Learn more

  • Full Depth Reclamation - Colorado Asphalt Pavement …

    (Asphalt Emulsion and Full Depth Reclamation and US Highway 160 East - Aztec Creek MP 11.5 – 17.97 ... • 310‐00700 Asphalt Emulsion Full Depth 156,030 SY ... Price Quantity Total Aggregate Base Course (Class 2) TON $13 30,620 $398,068 Aggregate Base Course (Class 6) TON $21 7,857 $165,017 Full Depth Reclamation of HMAReclamation of HMA

    Learn more

  • Midland Asphalt Materials Inc. Full Depth Reclamation

    Full-Depth Reclamation (FDR) is a full pavement rehabilitation process in which the pavement and a portion of the sub base material are uniformly crushed, pulverized and blended. This results in a stabilized base course.

    Learn more

  • Developing Standards and Specifications for Full Depth ...

    The report summarizes the work conducted during the development of procedures for conducting full depth reclamation of existing asphalt surfaced and unsurfaced roads.

    Authors Dennis A Morian · Mansour Solaimanian · Barry Scheetz · Shervin JahangirnejadAffiliation Pennsylvania State University · United States Department of TransportationAbout Best practice

    Learn more

  • Monroe County Road Commission Bid Comparison - …

    Monroe County Road Commission Bid Comparison Contract ID 2017 FDR ... Alternate 1 - Emulsified Asphalt Stabilized Base Course ... _ Full Depth Reclamation, Emulsified Asphalt Stabilized Base Course, 6 inch 0002 8507022 116,770 Gal …

    Learn more

  • Chapter 16 - 98042 - Recycling - Sustainability ...

    Full depth reclamation is a process in which all of the asphalt pavement section and a predetermined amount of underlying materials are treated with recycling agents to produce a stabilized base course.

    Learn more